ARSITEKTUR PELAKSANAAN

Keep responsibility clear as the project changes hands.

Delivery is not one event. Requirements, manufacturer decisions, procurement commitments, site interfaces and acceptance each belong to different stages. The architecture matters because responsibility can become ambiguous at every transition.

PURPOSE

A handoff is a control point.

This page defines the responsibility logic around a railway project. It does not duplicate the physical deployment sequence, product selection or project-reference record. The objective is to keep technical authority, CBP coordination and customer/project responsibility distinct as the engagement moves forward.

RESPONSIBILITY HANDOFFS

Five transitions that should remain explicit.

01

Operating need → technical requirement

Define what the railway must accomplish before a manufacturer or product is positioned.Control: customer need + CBP requirement coordination

02

Requirement → manufacturer solution

The relevant manufacturer confirms technology capability, configuration limits and technical documentation for the application.Authority: manufacturer / design owner

03

Technical route → procurement commitment

Commercial scope, exclusions, documentation, interfaces and acceptance basis should be explicit before an order is treated as execution-ready.Control: contracting parties + procurement framework

04

Supply → site deployment

Site readiness, installation responsibility, utilities, civil interfaces, training and commissioning must follow the actual contractual scope rather than assumptions created earlier in the project.Control: project responsibility matrix

05

Commissioning → operation & lifecycle support

FAT, shipment, installation, SAT, acceptance and current operation are separate states. Support, spares, calibration and warranty follow the state actually reached.Control: documented project stage

BOUNDARY

Coordination does not transfer technical authority.

CBP coordinates the Indonesian project interface according to the applicable principal and project scope. Manufacturer engineering authority, customer acceptance authority and contractual responsibilities remain where the governing documents place them.