When a railway needs repeated condition information across many systems, the value comes from keeping measurement, location and history synchronized.
In practice: put several inspections on one diagnostic platform so the network can be measured repeatedly instead of as isolated surveys.
Italy · Railway diagnostics integrator
Trainborne, wayside and software solutions for track, rail, catenary, clearance, wheel and visual diagnostics.
The offering spans track geometry, rail profile, turnout inspection, catenary and power-rail measurement, clearance, video inspection and software.
Measure track position, geometry, rail profile and related condition.
Best for: repeated network condition measurement
Measure and inspect complex switch and crossing assets.
Best for: high-value turnout maintenance
Measure overhead wire geometry, wear and power-rail condition.
Best for: electrified networks
Combine structure envelope with synchronized imagery.
Best for: fleet introduction and corridor asset surveys
Measure wheel profile, axle-box acceleration and hunting-related behaviour.
Best for: combined infrastructure and rolling-stock diagnostics
Turn repeated measurement into an organized condition history.
Best for: maintenance planning and trend analysis
Track, rail, catenary, clearance, wheels or several together.
Build the measurement platform around the operating environment.
Tie measurements to position and repeatable asset references.
Use trends to focus maintenance effort.
More sensors do not automatically mean better maintenance. The system must connect condition, location, history and an action owner.
Before: condition evidence lives in separate inspections and files.
After: multiple systems can be measured and trended in one coordinated architecture.
CBP defines the operating questions, coordinates Plasser Diagnostics system engineering, integration, commissioning and training, and helps structure how the data enters the customer maintenance process.
Start with the maintenance decisions you want the system to support. CBP will build the measurement route from there.