Railway Continuity Since 1980
Railway Engineering / Indonesia
01 / MEASURE & INSPECT

Turn condition into something the railway can act on.

Measurement is useful only when it answers a maintenance or acceptance question. CBP routes each problem to the specialist technology that measures the right thing, in the right place, with a result the customer can use.

THE CUSTOMER QUESTION

What exactly do we need to know about the vehicle, wheel, track or infrastructure?

THE CBP ROUTE

Choose the measurement method from the decision, not from the instrument catalogue.

PRODUCT ROUTES

Eight product routes. Eight different questions.

Wheel load, internal defects, wheel wear, track geometry, clearance, network diagnostics, physical gauges and condition monitoring are related, but they are not interchangeable.

01

Wheel Load & Vehicle Balance

IVM · POWERVE

See how much of the vehicle’s weight is carried by each wheel.

Choose it when: the vehicle must be balanced after production, overhaul, suspension work or modification

02

Wheel & Axle Internal Inspection

Actemium NDS

Find internal or near-surface defects without destroying the wheel or axle.

Choose it when: material integrity matters, not just external dimensions

03

Portable Wheel Measurement

KZV · Shinyei Technology

Measure wheel diameter, flange, tyre, tread profile and other portable wheel parameters.

Choose it when: technicians need repeatable wheel measurements directly in the depot

04

Track Geometry Measurement

KZV

Map where track gauge, alignment, level, twist or rail condition has changed.

Choose it when: maintenance needs exact locations rather than general route complaints

05

Clearance & Infrastructure Envelope

KZV · DMA

Measure the real space around the railway and compare it with what a vehicle or load needs.

Choose it when: introducing new rolling stock, special loads or infrastructure changes

06

Integrated Railway Diagnostics

DMA

Combine repeated track, rail, catenary, clearance, visual and vehicle measurements.

Choose it when: the operator needs network-scale condition information rather than one local survey

07

Railway Dimensional Gauges

Winchester Industries

Turn a drawing, rule or wear limit into a fast physical workshop check.

Choose it when: a dedicated pass/fail or dimensional gauge is the most practical method

08

Condition Monitoring & Vibration

IVM · DMA

Watch how vehicles and infrastructure behave over time to find developing problems.

Choose it when: the maintenance team wants an earlier trigger between scheduled inspections

TECHNOLOGY PRINCIPALS

Different problems need different specialists.

CBP deliberately uses several measurement principals because no single OEM owns every railway measurement problem.

01

IVM

Italy

Wheel load and wheel-rail interaction

02

Actemium NDS

Germany

Wheel and axle NDT

03

KZV

Czech Republic

Portable wheel, track and clearance measurement

04

Shinyei Technology

Japan

Portable railway metrology

05

DMA

Italy

Integrated trainborne and wayside diagnostics

06

Winchester Industries

USA

Mechanical railway gauges

WHAT TO DECIDE FIRST

Start with the maintenance decision, not the sensor.

A decision-maker should understand the outcome first: find imbalance, locate a hidden defect, identify worn geometry, map track condition, verify clearance or detect a developing trend. Exact accuracy, range and configuration come later with CBP.

NEED HELP CHOOSING?

Describe the railway problem in ordinary language.

CBP will narrow the technology route before discussing exact configuration.