Railway Continuity Since 1980
Railway Engineering / Indonesia
02 / TEST & VERIFY

Turn 'it should work' into measured evidence.

After maintenance, production or overhaul, the component still has to prove that it behaves correctly. CBP combines railway-specific test specialists with configurable test platforms according to the actual acceptance job.

THE CUSTOMER QUESTION

What must this component prove before it goes back into service?

THE CBP ROUTE

Build the test around the required behaviour, not around whichever bench happens to be available.

PRODUCT ROUTES

From one brake point to a complete railway test facility.

Brake force, springs, bogies, dampers, batteries and custom railway components each need a different test architecture.

01

Brake Force Testing

NET-Automation · ForceBEE / BrakeBEE

Measure the actual force produced at each brake and connect it with pneumatic behaviour.

Choose it when: pressure alone is not enough to explain braking performance

02

Railway Spring Testing

Easydur · CTW Automation

Load the spring and measure how force changes with movement.

Choose it when: production, overhaul or engineering needs a controlled spring characteristic

03

Bogie Testing

Easydur · IRMIE

Load and verify the complete bogie as an assembled railway system.

Choose it when: the bogie must be proven before installation or return to service

04

Damper Testing

Easydur · CTW Automation

Move the damper at controlled speed and measure its real force response.

Choose it when: visual condition does not prove dynamic performance

05

Pantograph & Component Test Benches

IRMIE Impianti

Engineer a repeatable railway test station around the component and its real interfaces.

Choose it when: the job needs pantograph, traction, gearbox, converter, door, HVAC, compressor or other custom testing

06

Railway Battery Testing

ENAG

Charge, discharge and measure how much usable battery capacity remains.

Choose it when: voltage and age are not enough to decide whether the battery stays in service

TECHNOLOGY PRINCIPALS

Different problems need different specialists.

These principals cover complementary parts of the verification problem, from specialist railway benches to configurable dynamic test systems.

01

NET-Automation

Austria

Direct brake-force and pneumatic brake testing

02

Easydur

Italy

Railway bogie, spring and damper testing

03

IRMIE Impianti

Italy

Custom railway test benches and facilities

04

ENAG

France

Railway battery and power testing

05

CTW Automation

USA

Configurable damper, spring and dynamic-component testing

WHAT TO DECIDE FIRST

Start with what must be proven before choosing the test system.

The test system matters because it makes a difficult verification repeatable. Start with what must be tested, how the result changes the acceptance decision, and what calibration, training and support are required to keep that process controlled.

NEED HELP CHOOSING?

Describe the railway problem in ordinary language.

CBP will narrow the technology route before discussing exact configuration.